1. Site & project information
2. Operators & stormwater team
3. Site map requirements
4. Drainage patterns
5. Receiving waters
6. Pollutant sources
7. Erosion and sediment controls
8. Pollution prevention controls
9. Inspection schedules
10. Corrective actions
11. Documentation and updates
12. Final stabilization
13. Permit termination

## DISCLAIMER
A compliant SWPPP must reflect actual site conditions, project phasing, receiving
waters, pollutant sources, BMPs, inspection schedules, corrective actions, and
stabilization requirements, permittees remain responsible for meeting their
specific permit's exact requirements.

## RELATED PAGES
- https://www.epa.gov/npdes/developing-stormwater-pollution-prevention-plan-swppp (EPA SWPPP guidance)
- /qualified-swppp-preparer-training/
- /construction-stormwater-inspection-training/
- /stormwater-bmp-training/
- /stormwater-regulations-and-standards/

Resources · SWPPP Preparation

How to Prepare a SWPPP

A Stormwater Pollution Prevention Plan is the core document behind construction stormwater compliance. Here's a plain-language walkthrough of what typically goes into one, aligned with EPA's SWPPP guidance.

What a SWPPP Is For

A SWPPP identifies the pollutant sources on a construction site and describes the Best Management Practices (BMPs) a project will use to control them, along with the inspection and documentation practices that keep the plan current as the site changes. EPA publishes its own SWPPP development guidance, and the components below summarize the elements most SWPPPs include. This page is a general overview, not a template, and not a substitute for reading your specific permit.

Plan Components

What Goes Into a SWPPP

1. Site & Project Information

Basic identifying information: project name and location, owner and operator contacts, project description, total site and disturbed acreage, and construction start and completion dates. This section anchors the rest of the plan to a specific project.

2. Operators & Stormwater Team

Identifies who is responsible for SWPPP implementation, owners, contractors, subcontractors, and the individuals performing inspections and BMP maintenance, along with their roles and contact information.

3. Site Map Requirements

A site map showing property boundaries, existing and proposed structures, drainage patterns, BMP locations, receiving waters, and areas of soil disturbance. The map is typically updated as construction phases change site conditions.

4. Drainage Patterns

A description of how stormwater flows across the site before, during, and after construction , including existing drainage, proposed changes, and discharge points, used to identify where BMPs are needed.

5. Receiving Waters

Identification of the water bodies that ultimately receive site stormwater discharges, including any impaired waters or waters with special protections that may trigger additional permit conditions.

6. Pollutant Sources

An inventory of activities and materials on site that could contribute pollutants to stormwater , exposed soil, vehicle tracking, concrete work, fueling areas, chemical storage, and construction waste, among others.

7. Erosion and Sediment Controls

The specific BMPs selected to prevent soil erosion and capture sediment before it leaves the site , such as silt fence, sediment basins, and stabilized entrances. See Stormwater BMP Training for a deeper look at BMP categories.

8. Pollution Prevention Controls

Practices addressing non-sediment pollutants: good housekeeping, material storage, concrete washout, spill prevention and response, and proper waste disposal.

9. Inspection Schedules

How often the site must be inspected, typically on a routine schedule plus after qualifying rain events, and who is responsible for performing and documenting those inspections. See Construction Stormwater Inspection Training for more detail.

10. Corrective Actions

The process for identifying BMP deficiencies during inspections, documenting them, and tracking repairs or replacements to closure within the permit's required timeframe.

11. Documentation and Updates

The SWPPP is a living document. As site conditions, phasing, or personnel change, the plan and its site map must be updated and dated, with a record of what changed and when.

12. Final Stabilization

Criteria for when disturbed soil is considered permanently stabilized (e.g. vegetative cover established or permanent surfaces installed), which affects when certain BMPs can be removed and when permit coverage can be terminated.

13. Permit Termination

The process and documentation required to formally close out permit coverage once final stabilization is achieved and all permit obligations have been met.

A compliant SWPPP must reflect actual site conditions, project phasing, receiving waters, pollutant sources, BMPs, inspection schedules, corrective actions, and stabilization requirements , permittees remain responsible for meeting their specific permit's exact requirements.

Go Deeper

Learn to Prepare a SWPPP in Depth

This page is a general overview. SWPPP Preparer Training covers plan structure, site hazard assessment, BMP design criteria, monitoring, and documentation in depth for anyone responsible for writing or maintaining a SWPPP.

Ready to Learn SWPPP Preparation?

Get hands-on training in plan structure, BMP design, and documentation.