Use this alongside your SWPPP and site map. Under the EPA CGP, the report must be completed within 24 hours of the inspection and signed by the operator's signatory. Nothing you check here is saved. Learn the rules in the inspections lesson.
Inspection trigger and scope
Disturbed areas and stabilization
Perimeter and sediment controls
Exits, track-out and inlets
Stockpiles, materials and waste
Dewatering (if occurring)
Discharge points and receiving waters
Follow-up
Sources and official references
Last reviewed: October 25, 2026 · Free general education based on the Clean Water Act, EPA NPDES rules and the EPA Construction General Permit. Your governing permit (EPA, state, tribal or local) controls. This is not legal advice, not EPA-approved, and not a California QSP/QSD or other state credential, and it does not issue a certificate. Nothing you enter on this page is saved or sent.
