summary     The difference between detention and retention ponds, plus infiltration basins, sediment basins, underground detention and catch basins: how each works, when to use it, and what maintenance it needs.

sections
- The short answer
- Side-by-side comparison
- Other stormwater basins
- What is a catch basin?
- Maintenance

faq
Q: What is the difference between a detention pond and a retention pond?
A: A detention pond temporarily stores runoff and drains dry between storms, mainly to reduce peak flow. A retention pond keeps a permanent pool of water and provides water quality treatment as well as peak control.
Q: Is a retention pond the same as a wet pond?
A: Yes. Retention pond and wet pond generally describe the same practice: a stormwater basin with a permanent pool of water.
Q: What is a catch basin?
A: A catch basin is a storm drain inlet with a sump below the outlet that traps sediment, trash and debris before water enters the storm sewer. It needs regular cleaning to keep working.
Q: How big does a construction sediment basin need to be?
A: Under the EPA Construction General Permit, a sediment basin must provide storage for the runoff from a 2-year, 24-hour storm or 3,600 cubic feet per acre drained, and use surface outlets unless infeasible. State permits may differ.

note        Free general education based on the Clean Water Act, EPA NPDES rules and the EPA Construction General Permit. Your governing permit (EPA, state, tribal or local) controls. This is not legal advice, not EPA-approved, and not a California QSP/QSD or other state credential, and it does not issue a certificate. Nothing you enter on this page is saved or sent.

Courses delivered by HAZWOPER OSHA Training, LLC, an IACET Accredited ProviderDelivered by an IACET Accredited Provider

Leer en espaƱol

Free Guide

Detention Pond vs. Retention Pond: Differences, Uses and Maintenance

Dry pond or wet pond? Detention or retention? The terms get mixed up constantly. Here is what each basin does, when designers choose it, and what it takes to keep it working.

  • 7 min read
  • Updated October 25, 2026
On this page
  1. The short answer
  2. Side-by-side comparison
  3. Other stormwater basins
  4. What is a catch basin?
  5. Maintenance
  6. FAQ

The short answer

  • A detention pond (dry pond) temporarily holds stormwater and releases it slowly through an outlet, then drains dry between storms. Its main job is reducing peak flow and downstream flooding.
  • A retention pond (wet pond) keeps a permanent pool of water. Incoming runoff displaces water that has already been treated, and the pool provides settling and biological treatment in addition to peak control.

Side-by-side comparison

Detention (dry) pondRetention (wet) pond
Water between stormsDryPermanent pool
Main purposePeak flow controlPeak control plus water quality treatment
Pollutant removalLimited, unless designed as extended detentionBetter settling and nutrient uptake
SpaceCan double as a field or open spacePool takes permanent space
Common concernsClogged outlets, standing water, mowingAlgae, sediment buildup, mosquitoes, safety around water
Typical useCommercial sites, subdivisions with flood control needsLarger developments, sites needing treatment, amenity ponds

Extended detention ponds hold water longer (often a day or more) to let more sediment settle, closing part of the treatment gap.

Other stormwater basins

  • Infiltration basin: holds runoff until it soaks into the ground. Reduces volume and recharges groundwater, but needs permeable soils and pretreatment to avoid clogging.
  • Sediment basin: a temporary construction basin that captures sediment during grading. Under the EPA CGP it must store the 2-year, 24-hour storm runoff or 3,600 cubic feet per acre drained. Many sediment basins are later converted to permanent ponds. Try the sediment basin calculator.
  • Underground detention: pipes, chambers or vaults beneath parking lots that work like a detention pond where surface space is limited.
  • Bioretention: a shallow planted basin with engineered soil that filters and often infiltrates runoff. See post-construction stormwater.

What is a catch basin?

A catch basin is a storm drain inlet structure with a sump below the outlet pipe that traps sediment, trash and debris before water continues into the storm sewer. Catch basins need regular cleaning, typically with a vacuum truck, or the sump fills and pollutants pass straight through. During construction, catch basins and other inlets need inlet protection.

Maintenance

  • Inspect after major storms and on a set schedule, often annually at minimum under local maintenance agreements.
  • Keep outlets clear of debris, trash and vegetation.
  • Remove sediment from forebays and the basin before it reduces design capacity.
  • Manage vegetation: mow dry ponds, control woody growth on embankments, and manage invasive plants.
  • Check embankments and spillways for erosion, seepage and burrows.

Sources and official references

Last reviewed: October 25, 2026 · Free general education based on the Clean Water Act, EPA NPDES rules and the EPA Construction General Permit. Your governing permit (EPA, state, tribal or local) controls. This is not legal advice, not EPA-approved, and not a California QSP/QSD or other state credential, and it does not issue a certificate. Nothing you enter on this page is saved or sent.

FAQ

Frequently asked questions

A detention pond temporarily stores runoff and drains dry between storms, mainly to reduce peak flow. A retention pond keeps a permanent pool of water and provides water quality treatment as well as peak control.

Yes. Retention pond and wet pond generally describe the same practice: a stormwater basin with a permanent pool of water.

A catch basin is a storm drain inlet with a sump below the outlet that traps sediment, trash and debris before water enters the storm sewer. It needs regular cleaning to keep working.

Under the EPA Construction General Permit, a sediment basin must provide storage for the runoff from a 2-year, 24-hour storm or 3,600 cubic feet per acre drained, and use surface outlets unless infeasible. State permits may differ.